PSE&G Work - Week of 9/23/19

Posted Fri, Sep 20, 2019, From Secaucus Township
During the week of September 23, 2019, PSE&G crews will perform the following work:
Tuesday-Friday: Replacing gas main and services on 1st Ave @ Roosevelt Ave.….7am to 4pm. 1st Ave. will be closed to thru traffic with the exception of emergency and handicap access.
Replacing gas main and services on 6th St between Centre Ave. and Front St…7am to 4pm. 6th St. will be closed to thru traffic with the exception of emergency and handicap access.
Monday: Replacing gas main and services on Central Ln between Stonewall and Garry Terr.…7am to 4pm. Central Ln. will be closed to thru traffic with the exception of emergency and handicap access.
Replacing gas main and services on Mansfield Pl @ Sparman Dr…. 7am to 4pm. Mansfield Pl. will be closed to thru traffic with the exception of emergency and handicap access.

This project is part of the PSE&G Gas System Modernization Program (GSMP) to replace aging cast iron and unprotected steel gas mains in order to support a safe, clean and reliable gas system.

The mains and services will be replaced with stronger more durable materials which are much less likely to have leaks and release methane gas.

The new elevated pressure systems also enable the installation of excess flow valves that dramatically reduce gas flow if a service line is damaged, and provide better support for the use of high-efficiency appliances.
back to news & announcements
back to news & announcements
OTHER FEATURES
Weird Fashion Statements
SecaucusNJ.net ©2024